Description
Faux Red Brick concrete was never poured after sewer work was completed in the fall of 2023. Now that the temperatures have risen and the snow is gone, can the city please replace the red concrete that was removed? The open sidewalk is an ankle sprain waiting to happen!
also asked...
Q. Please provide the exact address of the sidewalk issue/concern.
A. 1 Bleecker Place
A. 1 Bleecker Place
Q. Please check all boxes that apply
A. Raised Panel/Tripping Points, Sunken Panel
A. Raised Panel/Tripping Points, Sunken Panel
5 Comments
Albany, NY (Verified Official)
Acknowledged Department of General Services (Verified Official)
DGS_VictoriaFrey (Verified Official)
DGS_VictoriaFrey (Verified Official)
DGS_VictoriaFrey (Verified Official)