Faux Red Brick concrete was never poured after sewer work was completed in the fall of 2023. Now that the temperatures have risen and the snow is gone, can the city please replace the red concrete that was removed? The open sidewalk is an ankle sprain waiting to happen!
还问了...
问 Please provide the exact address of the sidewalk issue/concern.
答 1 Bleecker Place
答 1 Bleecker Place
问 Please check all boxes that apply
答 Raised Panel/Tripping Points, Sunken Panel
答 Raised Panel/Tripping Points, Sunken Panel