Beschreibung
Faux Red Brick concrete was never poured after sewer work was completed in the fall of 2023. Now that the temperatures have risen and the snow is gone, can the city please replace the red concrete that was removed? The open sidewalk is an ankle sprain waiting to happen!
auch gefragt...
F. Please provide the exact address of the sidewalk issue/concern.
A. 1 Bleecker Place
A. 1 Bleecker Place
F. Please check all boxes that apply
A. Raised Panel/Tripping Points, Sunken Panel
A. Raised Panel/Tripping Points, Sunken Panel
5 Kommentierens
Albany, NY (Verifizierter Beamter)
Anerkannt Department of General Services (Verifizierter Beamter)
DGS_VictoriaFrey (Verifizierter Beamter)
DGS_VictoriaFrey (Verifizierter Beamter)
DGS_VictoriaFrey (Verifizierter Beamter)