Mô tả
Faux Red Brick concrete was never poured after sewer work was completed in the fall of 2023. Now that the temperatures have risen and the snow is gone, can the city please replace the red concrete that was removed? The open sidewalk is an ankle sprain waiting to happen!
cũng đã hỏi...
Hỏi. Please provide the exact address of the sidewalk issue/concern.
Đáp. 1 Bleecker Place
Đáp. 1 Bleecker Place
Hỏi. Please check all boxes that apply
Đáp. Raised Panel/Tripping Points, Sunken Panel
Đáp. Raised Panel/Tripping Points, Sunken Panel
5 Bình luậns
Albany, NY (Chính thức đã xác nhận)
Được thừa nhận Department of General Services (Chính thức đã xác nhận)
DGS_VictoriaFrey (Chính thức đã xác nhận)
DGS_VictoriaFrey (Chính thức đã xác nhận)
DGS_VictoriaFrey (Chính thức đã xác nhận)