Description
9 months ago Prospect Street was repaved leaving a large gap between the sidewalk and street causing damage to cars pulling into driveways (see 638 Prospect photo from that time). Recently a contractor has been repairing the sidewalk and curb. Our curb was repaired a few weeks ago and the sidewalk gradually replaced up to the driveway. Workers advised us to move our cars and that the driveway would be repaired within a few days, then the crews disappeared. They came back this week and removed the work signs and cones, but never repaired the gap between the street and the driveway.
5 Comments
Acknowledged Department of Public Works (Verified Official)
Xiaorong Wang (Registered User)
Executive Administrative Assistant - Department of Parks & Public Works (Verified Official)
BG (Registered User)
Content blocked by rejections (Registered User)
Please let us ALL know when SCF actually FIXES this "issue".